Guoneng Chongqing Power Plant

Solution

Project location: Wansheng District, Chongqing City
Equipment selection:1450KW Steam-fired LiBr Absorption Chiller
Main function: Using the waste heat from waste power plants; improve the utilization of heat energy.
Energy Conservation: Compared to electric chillers, annual electricity consumption is reduced by approximately 400,000 kWh, equivalent to a reduction of about 320 tons of carbon dioxide emissions.
Return on Investment: Annual electricity cost savings amount to approximately 320,000 CNY(calculated at the local electricity rate of 0.8 CNY/kWh), with maintenance costs 15% lower than electric chiller.

S.N 28 - Guoneng Chongqing Power Plant

steam fired absorption chiller
Steam fired absorption chiller