Linqu Western Thermal Power Station Project
Steam LiBr Absorption Heat Pump
Project location: Linqu, Shangdong
Equipment selection: 1 unit 31.33MW steam LiBr absorption heat pump
Main function: Exhaust heat recovery and district heating
General introduction
There are 3 unit back-pressure coal fired steam boiler, generating 450,000m3 exhaust gas per hour. Hope Deepblue cooperated with Yurunfeng technology company, which signed the EMC with thermal power station, to build a exhaust waste heat recovery system, including LiBr absorption heat pump, spray tower and some other system components, with annual recovery heat 130,000 GJ, bring great economic benefits for power station and city heating.
Hope Deepblue provided 1 unit LiBr absorption heat pump for this Linqu thermal power station with heating capacity of 31.3MW. The centralized heat supply station is a exhaust waste heat recovery system.
The unit recovers 20 ℃ (50 ℃ -30 ℃) exhaust heat from the wet desulphurization of 3 unit 75-ton coal-fired steam boilers. In the heating season, 130,000 GJ waste heat can be recovered, and can supply heating to 500,000 m2 areas, bringing huge economic benefits to the enterprise and making important contributions to environmental protection.
The system is convenient for enterprises to recover waste heat energy, increase urban heating area, and bring huge economic benefits to heating supply enterprises, such as power plant, steel plant.
Technical Data
Heating capacity: 31.33MW/unit
Qty: 1 unit
DHW inlet: 45°C
DHW outlet: 65°C
Driven steam pressure: 0.25MPa(G)
COP: ≥1.71
Dimension: 9900*5100*8500mm
Operation weight: 123.1 t/unit
Web: https://www.deepbluechiller.com/
E-Mail: yut@dlhope.com / young@dlhope.com
Mob: +86 15882434819/+86 15680009866
Post time: Mar-31-2023