S.N 12 - Datang International Beijing Gaojing Power Plant
Project location: Beijing, Shi Jing Shan
Equipment selection: 2 unit 1744KW hot water LiBr absorption chiller
Main function: Utilize waste heat of steam condensate to make 7℃ chilled water for using refrigeration.
General introduction
The total installed capacity of the plant is 600000 kW with 6 units of 100,000 KW, 8 units of boiler, external heating area is 508,000,0 meters, and become the most important power supply support point and heat source point, promote high quality and cheap heat source for Beijing.
Web: https://www.deepbluechiller.com/
E-Mail: yut@dlhope.com / young@dlhope.com
Mob: +86 15882434819/+86 15680009866
Post time: Mar-30-2023